Location:
Juliette, GA
Completed:
2020

Units 1-4 Precipitator Sump Equipment Installation

Scope of Work

Rerouted sump discharge piping from the ash ponds to the new on-site water treatment facility. The work included the structural, mechanical, and electrical installation of a new piping system containing three thousand five hundred (3,500) linear feet of pipe and sixty-five thousand (65,000) linear feet of electrical cable. During the completion of the project, an additional five million ($5,000,000) was awarded for time and material-based work, which more than doubled the size of the contract. Although the project scope grew, the project was completed while adhering to the originally agreed-upon schedule.

Project Details
  • Constructed various engineering design changes, owner-requested changes, and punch list-related scopes.
  • Peak workforce of more than ninety (90) craftspeople.
  • Installed twenty thousand (20,000) linear feet of low-voltage cable as part of these efforts.
  • Rerouted sump discharge piping from the ash ponds to the new onsite water treatment facility.
  • Installed a new piping system containing three thousand five hundred (3,500) linear feet of pipe and sixty-five thousand (65,000) linear feet of electrical cable.
  • Assisted the client with start-up and commissioning to ensure a successful turnover.
Lean, Innovative and Unique Project Solutions
This project continued through the COVID-19 pandemic while adhering to the original schedule while adapting to the centers for disease control (CDC), government agencies, the client, and ²ÝÝ®ÊÓƵAPP's policies and procedures.
No items found.

Our Offices
Corporate Headquarters
P.O. Box 1000
Pittsfield, ME 04967
207-487-3311
info@cianbro.com

Email Us

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.