The Wharf Phase 2 consisted of demolishing the existing floating docks, two piers, and three buildings and the construction of two new piers. In addition, ²ÝÝ®ÊÓƵAPP installed approximately 1,000 linear feet of king pile wall, along with a concrete cap, timber fendering, and approximately 75,000 square feet of concrete floating docks with utilities.
²ÝÝ®ÊÓƵAPP installed 3,000-pound, pre-fabricated timber panels utilizing a custom built "jig" which facilitated the installation process. ²ÝÝ®ÊÓƵAPP also streamlined the construction process by utilizing pull planning and adhering to the scheduled milestone activities.